A job we carried out for Morrison Construction was at Inverness Royal Academy. Work on the demolition and asbestos removal commenced after the completion of the new school building by the Principal Contractor. With the new and old buildings being located side by side, and the school being fully operational during the works, this would be a challenging task. The steel frame building was of varying height (single to three storey) with numerous additional sections of the building having been added over time with varying depths of foundations. There were also various outbuildings including prefabricated huts and classrooms.

 

Before the demolition works commenced, two asbestos squads carried out the extensive asbestos removal work to the building. The notifiable section of the works consisted of 32 separate enclosures, with many being managed and completed simultaneously. This work involved the removal of AIB risers, panels and debris within classrooms, corridors and communal areas.


A full soft strip of all the buildings was carried out, segregating all the waste on site into various categories for disposal or recycling (wood, scrap, general etc.). A permit to work burning gear was used on site where necessary. There were elements of hand demolition on this site due to the close proximity to the next build, which was too close for mechanical demolition to take place. Three 35 tonne excavators were used in the demolition works, all fitted with attachments such as hydraulic crushers, steel cutting shears and hydraulic hammers. All suitable material was crushed on site and re-used to level off on completion.

Asbestos Removal

  • Asbestos cement – 1200m-squared of cement cladding removed before demolition works commenced
  • Asbestos insulating board – 32 enclosures erected throughout the building
  • 38 tons of asbestos-containing materials removed from site 


Demolition

  • In excess of 14,000 tons of material crushed
  • In excess of 12,250m-squared of floor area strip out, fixtures and fittings, partition walling, ceilings and floor coverings, as well as completion of all mechanical/ electrical services

Choose Gowrie Contracts for quality and safe demolition work in Inverness.

Call us

01382 826579

Email us

admin@gowriecontracts.co.uk

Find us

9 Faraday Street, Dundee, DD2 3QQ

Business Hours

Mon - Thu
-
Friday
-
Sat - Sun
Closed

Contact Us

Share by: