Project Overview:
Gowrie Contracts managed the demolition of a disused swimming pool adjacent to the Mercat Shopping Centre. This complex project required the safe removal of hazardous materials and precise dismantling of structural elements to minimise disruption to nearby businesses.
Key Highlights:
- Asbestos Removal:
- AIB trims removed from ceilings and lighting above pools.
- Enclosure scaffolding installed to access external soffits.
- Full site clearance of asbestos-containing materials.
- Demolition:
- Soft strip-out of all internal fixtures.
- Roof removed using a 50-tonne excavator.
- 35-tonne excavators used for structure and foundation removal.